Other projects
- Three Transmission Gas Pipelines and Two City Gas Distribution Networks Project: ACESCo provided basic design and tender documents for the construction of the following Four Transmission Pipelines & Two area distribution networks:
- Transmission Gas Pipe Line Benghazi-Tobruk with total length of 450Km
- Transmission Gas Pipe Line AlWafa-Sabha with total length of 480Km
- Transmission Gas Pipe Line Entessar Field 103-Sarir with total length of 250km
- Transmission Gas Pipe Line Nalut-Gherian with total length of 200km
- 4 Cities Gas Distribution Network in Green Mountain Area
- 3 Cities Gas Distribution Network in Western Mountain Area
- Gas Master Plan and City Gas Distribution Networks Project
- Optimized investments in gas transmission pipelines in the long term
- Study the feasibility and basic design of pipeline infrastructure and city gas distribution
- Optimum routes for gas transmission by accommodating future needs for power & industrial sectors, and domestic consumption
- A set of studies for the project implementation
- Tripoli, Misurata., Benghazi
- Al Azizia, Al Nawahi Al Arbaa, Tajura, West Janzor
For Gas Master Plan ACESCo provided the following:
For City Gas Distribution Networks ACESCo provided basic design and tender documents for projects construction (Transmission and Distribution Projects) to feed 500,000 Domestic & commercial customers located in the following areas: